A 200 A mobile home feeder on aluminum runs on 4/0 AWG phase conductors, and it has to be a four-wire cable with an equipment ground because the mobile home panel is fed as a sub-panel. The mobile home feeder cable in 4/0-4/0-2/0-4 is built for exactly this pull: USE-2 rated for direct burial, two 4/0 hots, a 2/0 neutral and a 4 AWG ground.
A 200 A mobile home feeder on aluminum runs on 4/0 AWG phase conductors, and it has to be a four-wire cable with an equipment ground because the mobile home panel is fed as a sub-panel. The mobile home feeder cable in 4/0-4/0-2/0-4 is built for exactly this pull: USE-2 rated for direct burial, two 4/0 hots, a 2/0 neutral and a 4 AWG ground. At 100 ft, voltage drop on 4/0 aluminum is under 2 percent at full load, so no upsizing is needed for distance. One 500 ft reel covers the job with plenty left.
This is the one cable in the catalogue purpose-built for a pedestal-to-mobile-home feeder: USE-2/RHW-2 insulation approved for direct burial, four conductors so you get the separate equipment ground a mobile home feeder requires, and 4/0 AA-8000 aluminum phases, which is the standard size for a 200 A dwelling feeder. The 4 AWG aluminum ground matches a 200 A overcurrent device and the 2/0 neutral is the usual reduced neutral for a 120/240 V dwelling load. At 100 ft, 4/0 aluminum at 200 A drops about 4 V, under 2 percent, so distance is not a concern. The 500 ft put-up is the smallest one in this configuration and is the right buy for a single run.
100 ft of trench plus about 10 ft of rise and termination slack at each end is roughly 120 to 125 ft, which one 500 ft reel covers with about 375 ft left over.
Also consider: MHF4/0-4/0-4/0-2/0/1M gives a full-size 4/0 neutral and 2/0 ground if your load calc or inspector wants a full neutral, but it only comes on a 1000 ft reel and costs considerably more; for one run the 4/0-4/0-2/0-4 on a 500 ft reel is the right call.
What we can't supply for this job
Assumed: The pedestal breaker is 200 A and the mobile home panel is 200 A, 120/240 V single-phase. The 100 ft is the trench length; the vertical rises at the pedestal and under the home add roughly 10 ft each end. Cable goes directly in the trench, not in conduit for its full length. A reduced neutral (2/0) is acceptable for your load; most mobile home feeders qualify.
Change the numbers to yours and get your own list at today's prices.
You get the parts, the quantities, today's prices and the reasoning, ready to add to the cart.
Prices are today's and follow the copper and aluminum markets each weekday; quantities are for the example job. Confirm code requirements with your inspector. How we price